|
The client company was experiencing bottlenecks in the piping system that severely decreased the flow from a steam generator causing drops in steam pressure. This, in turn, decreased output from the manufacturing operation. The company wanted to upgrade the steam turbine generator and the piping that distributes the steam.
|